Checking a Builder Before You Sign a Renovation Contract
Renovations start with the good bit. You sketch out the new kitchen, look at tiles and benchtops, get a few quotes in. The paperwork comes later, and that’s where a lot of the problems begin. Doing some checking on the builder before you sign can save you a lot of grief once the walls start coming down.
Every state and territory has its own building laws and its own regulator, and the rules change over time. We’ll use New South Wales and Victoria as examples, but check how things stand where you live.
Look up their licence
All the states run some kind of licensing or registration system for people doing residential building work. In NSW the contract has to show the licence holder’s name exactly as it’s written on the licence, plus the licence number, so you’ve got something solid to check against the public register. In Victoria the consumer regulator points owners to a Find a practitioner search run by the Building and Plumbing Commission.
Make sure the name on the quote is the same as the name on the licence. A company name and a person’s name aren’t the same thing. And look at what class of work the licence covers, because a licence for one trade won’t always cover a whole renovation.
The contract
A handshake feels friendly but it doesn’t give you much to fall back on if things go wrong. In NSW you need a written contract for residential building work priced over $5,000 including GST. Same if the price isn’t known but the fair market cost of labour and materials is over $5,000. The contract value counts both labour and materials. Even on smaller jobs, getting it in writing is a sensible idea.
NSW splits jobs into two kinds. Work from $5,000 to $20,000 needs a small works contract, and work over $20,000 needs a bigger home building contract with more detail in it. The NSW Government sets out what each one has to include in its guide to home building contracts.
A decent contract describes the work and has the plans and specifications attached. It gives the price and tells you if that price could change. It explains how variations get agreed and how the job can be ended. On larger NSW jobs, variations have to be in writing and signed by both of you. When you’re reading through it, check it has:
- the builder’s name and licence number exactly as licensed
- a full description of the work, with plans and specifications
- the contract price and anything that could change it
- a progress payment schedule tied to stages or finished work
- how variations are agreed and written down
- the cost of any home building insurance that applies
Have a close look at the inclusions too. Things like tiles, tapware and timber often go in as provisional sums or allowances, and if the allowance is low your final bill can climb. Ask what brand and grade each allowance is based on before you sign anything.
Bigger NSW contracts have to include a cooling off period of 5 clear business days, and you’re entitled to a signed copy of the contract within 5 days of signing. Use that time. Read every page again, and if something doesn’t match what you talked about, bring it up before the period runs out.
Money: deposits, progress payments and insurance
Deposits have legal limits and they’re different from state to state. In NSW a deposit can’t be more than 10 per cent, whether it’s small works or a larger job. In Victoria it’s capped at 10 per cent when the total contract price is under $20,000, and drops to 5 per cent when it’s $20,000 or more. Other states set their own limits.
If a builder asks for more than the legal limit, take that as a warning sign. A big amount up front also leaves you exposed if the business goes under before work even starts. Keep a receipt for every payment and pay in a way that leaves a clear record.
After that, payments should follow the work and never get ahead of it. Consumer Affairs Victoria tells owners to pay only according to the schedule in the contract and only for stages that are actually finished. Its checklist for paying for building work also says not to pay in advance, because domestic building insurance may not cover work you paid for early.
In NSW, the progress schedule on a larger job can only use fixed stage payments or payments as work is done, or a mix of the two. Payments as work is done should be backed up with invoices or receipts. In Victoria, the final payment on an extension or renovation is due once a Certificate of Final Inspection has been issued, and Consumer Affairs Victoria says the builder isn’t entitled to it before then.
Defects are a separate thing from the payment schedule. Consumer Affairs Victoria warns owners not to hold back a progress payment over defects once a stage is finished, and recommends getting legal advice before withholding any payment at all. Talk to the builder first, put the defect to them in writing, and keep a record of what you agreed.
Then there’s insurance. Most states require some sort of home warranty or domestic building insurance once a job goes over a certain value, and the thresholds vary. In NSW the builder has to give you a certificate under the Home Building Compensation Scheme for contracts over $20,000. In Victoria the threshold for this advice is work over $16,000,
For Victorian jobs over $16,000, Consumer Affairs Victoria says not to pay a deposit until you’ve got three things sorted. First, evidence of the builder’s domestic building insurance policy. Second, a current certificate of insurance for your address. And third, you’ve checked the builder’s registration number. If the builder is slow to hand any of that over, hold on to your money until they do.
Don’t forget the outside
A lot of renovations end up spilling out into the yard. A new deck, some paving, a garden redo once the builders have gone. If you’re adding a deck, our look at the pros and cons of composite decking might help you choose boards before the builder prices them. And it’s worth taking your time with landscaping rather than rushing the garden the minute the builder packs up.
Garden work can go in the same contract or be done separately. If you want screening along a new extension, look at the best hedges for landscaping early on. Lawns chewed up by machinery and skip bins can be brought back with some care, and we’ve covered that in our piece on keeping your grass greener. Whatever you decide, write any outdoor work into the scope so nobody’s arguing about it later.